ST LAURENT LMC Eurocold - Santoro Architecte
 

ST LAURENT LMC

Eurocold

7  INDUSTRIEL TERTIAIRE

Construction d’un bâtiment tertiaire et logistique LMC EUROCOLD

Maître ouvrage : LMC EUROCOLD

Marché privé

Localisation : Saint Laurent de Mure 69720

Programme : Siège tertiaire, base logistique et de distribution matériel de froid et congélation

Surface développée : 11 200 m2

Coût des travaux : 7 980 000 € HT

Année : 2007/2008

Mission : Base